{"id":211,"date":"2015-08-15T03:18:40","date_gmt":"2015-08-15T03:18:40","guid":{"rendered":"https:\/\/ministeriocasaverde.com\/ministry\/?page_id=211"},"modified":"2025-10-06T02:06:00","modified_gmt":"2025-10-06T02:06:00","slug":"dump-project-expense-report","status":"publish","type":"page","link":"https:\/\/ministeriocasaverde.com\/ministry\/projects\/dump-project-expense-report\/","title":{"rendered":"Dump Project Expense Report"},"content":{"rendered":"<p><strong>Expense Report and brief summary \u00a0for Project \u201cEVERY LIFE\u201d <\/strong><br \/>\n<strong>August 2014 to May 2015<\/strong><\/p>\n<ul>\n<li><strong>Q38,443.00<\/strong> &#8211; Initial construction supply purchase, detail, Purchased locally at\u00a0 Fercompaiz (hardware store). Purchase included, 96 tin roofing sheets of 12 feet each; 1000 cement blocks 75x20x40; corrugated re-bar 3\/8, 8 bundles; \u00bc smooth\u00a0 rebar for construction, 2 bundles; tie wire, 20 pounds, 20 steel beams 2x4x20 feet; cement, 100 bags; 12 meters of sand and 12 meters of rocks; (wood)\u00a0 16 boards\u00a0 1x12x10, 32 boards 2x3x12; 60 boards 2x3x825 meters of fencing (chain link style) 10 pounds of nails 4\u201d; 10 pounds of nails 3\u201d; 10 pounds of nails 2\u201d; 3 pipes 4\u201d diameter with 4 90\u2019s and 1 \u201cT\u201d<\/li>\n<li><strong>Q8,700.00<\/strong> \u2013 Fill Dirt \u2013 29 truck loads<\/li>\n<li><strong>Q2,000.00<\/strong> \u2013 lunch for the workers<\/li>\n<li><strong>Q2,000.00<\/strong> \u2013 tractor work, leveling out the dirt and packing it down<\/li>\n<li><strong>Q2,400.00<\/strong> \u2013 water trucked in for the project (not including the floor)<\/li>\n<li><strong>Q6,000.00<\/strong> \u2013 repairs to our vehicles entering the dump, including flat tires<\/li>\n<li><strong>Q30,000.00<\/strong> \u2013 to the metal roofing contractor, includes painting and welding the super structure, installing 100 tin roofing sections at 12 feet each and transportation to and from job site.<\/li>\n<li><strong>Q2,500.00<\/strong> \u2013 rental of a gas powered welding machine and generator<\/li>\n<li><strong>Q15,500.00<\/strong> \u2013 Four months of gasoline for the project, transportation to and from the site daily, plus generator, and transport of materials as needed<\/li>\n<li><strong>Q1,500.00<\/strong> \u2013 20 additional bags of cement<\/li>\n<li><strong>Q1,396.00<\/strong> \u2013 4 additional meters of sand and 4 additional meters of rocks<\/li>\n<li><strong>Q35,000.00<\/strong> \u2013 labor not including floor (4 persons, 4 months, minimum wage)<\/li>\n<li><strong>Q5,000.00<\/strong> \u2013 labor for installing the floor<\/li>\n<li><strong>Q115,500.00 <\/strong>\u2013 Electric company, for 9 poles, tension wires, 900&#215;2 meters of cable, transformer, street lights,\u00a0 LED lighting and wiring and grounding<\/li>\n<\/ul>\n<p><strong>TOTAL EXPENSE \u2013 Q265,939.00 \/ $35,459.00<\/strong><\/p>\n<p>Donation (New Hampshire Charitable Foundation)<strong> \u2013 \u00a0 \u00a0 (Q219,450.00 \/ \u00a0\u00a0$28,500)<\/strong><br \/>\nDonation &#8211; Private Donor (CL)<strong> &#8211; \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0(Q10,000.00 \u00a0\/ $1,334.00)<\/strong><br \/>\nDonation \u2013 Iglesia Vida Real (Church)<strong> &#8211; \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 (Q5,000 \u00a0\u00a0\u00a0\u00a0\u00a0\/ \u00a0 \u00a0 \u00a0 $733,00)<\/strong><br \/>\nDonation \u2013 (Radio FeLove)<strong> &#8211;\u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 (Q37,668.40\u00a0 \u00a0 \/\u00a0 \u00a0 $4,892)<\/strong><\/p>\n<hr \/>\n<p><strong>Brief description of the Project \u201cEVERY LIFE\u201d<\/strong><\/p>\n<p style=\"text-align: justify;\">This is a report on the project of the refuge center at the city garbage dump. In August 2014 we started the construction of what would become a refuge center as part of project \u201cEvery Life\u201d. \u00a0The first thing we discovered was that there were several hundred barrels full of some liquid waste that were buried six meters down under our construction site. That caused the land to be very unstable. We had to bring in a lot of dirt and refill the land and pack it down. This was the first of what would be several additional costs to the project.\u00a0 Because of these barrels we had to change the entire design of the building which caused some delays in starting the project.\u00a0 In order for the building to be stable on this land we had to reconfigure the entire foundation. \u00a0Once we had the foundation set we begin construction immediately first putting in the pilings then installing the superstructure and the roofing. We also had several guys\u00a0walk off the job. It just seems that the smell, the smoke from burning trash, the flies and the ambient of the garbage dump was just too much for them. It was true; we all got sick from the smoke when the wind was blowing it towards us.\u00a0 We also discovered that none of the hardware stores would deliver supplies into this area, nor did any of the companies and services that we needed to complete the project, therefore we had to arrange transportation for everything that we needed to build the structure. \u00a0 The seasonal rains brought lots of mosquitoes and flies, the guys were getting bit and all started to get sick, almost like a mild dengue fever.\u00a0\u00a0\u00a0 We then took some time off for the Christmas holidays and started working again in late February 2015. \u00a0We continued working just on the weekends.\u00a0 It took several months to install the floor of the building the reason behind this was there&#8217;s no water, It was officially dry season! \u00a0We had to bring water in barrels in our truck from several kilometers away this took a lot of time, \u00a0Before it dries up we were getting the water out of a small creek and bringing it up to the road in five gallon buckets.\u00a0\u00a0\u00a0 The Electric Company has \u00a0nine poles the tension wires and 900 meters of cables along with public lighting as well as the indoor lighting in the style of LED bulbs.\u00a0 At the time of this report the electrical has not been completed.\u00a0 I spoke with the engineer at the power company who mentioned they had a few bad weeks as far as technical problems on their network and that they would soon be starting the work.\u00a0 This part of the project will bring electricity to an area that never had access to electricity before.\u00a0 One of the families living at the dump has already ordered a meter for his shack.\u00a0 The power company here has what they call a social rate and if you use under 100kw per month it is very affordable, something like $12.\u00a0 This will help the families at the dump to at least have some lights and charge their cell phones.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Expense Report and brief summary \u00a0for Project \u201cEVERY LIFE\u201d August 2014 to May 2015 Q38,443.00 &#8211; Initial construction supply purchase, detail, Purchased locally at\u00a0 Fercompaiz (hardware store). Purchase included, 96 tin roofing sheets of 12 feet each; 1000 cement blocks &hellip; <a href=\"https:\/\/ministeriocasaverde.com\/ministry\/projects\/dump-project-expense-report\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":5,"featured_media":0,"parent":47,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-211","page","type-page","status-publish","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Dump Project Expense Report - Ministerio Casa Verde<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/ministeriocasaverde.com\/ministry\/projects\/dump-project-expense-report\/\" \/>\n<meta property=\"og:locale\" content=\"es_ES\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Dump Project Expense Report - Ministerio Casa Verde\" \/>\n<meta property=\"og:description\" content=\"Expense Report and brief summary \u00a0for Project \u201cEVERY LIFE\u201d August 2014 to May 2015 Q38,443.00 &#8211; Initial construction supply purchase, detail, Purchased locally at\u00a0 Fercompaiz (hardware store). Purchase included, 96 tin roofing sheets of 12 feet each; 1000 cement blocks &hellip; Continue reading &rarr;\" \/>\n<meta property=\"og:url\" content=\"https:\/\/ministeriocasaverde.com\/ministry\/projects\/dump-project-expense-report\/\" \/>\n<meta property=\"og:site_name\" content=\"Ministerio Casa Verde\" \/>\n<meta property=\"article:modified_time\" content=\"2025-10-06T02:06:00+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"4 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/ministeriocasaverde.com\\\/ministry\\\/projects\\\/dump-project-expense-report\\\/\",\"url\":\"https:\\\/\\\/ministeriocasaverde.com\\\/ministry\\\/projects\\\/dump-project-expense-report\\\/\",\"name\":\"Dump Project Expense Report - Ministerio Casa Verde\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/ministeriocasaverde.com\\\/ministry\\\/#website\"},\"datePublished\":\"2015-08-15T03:18:40+00:00\",\"dateModified\":\"2025-10-06T02:06:00+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/ministeriocasaverde.com\\\/ministry\\\/projects\\\/dump-project-expense-report\\\/#breadcrumb\"},\"inLanguage\":\"es\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/ministeriocasaverde.com\\\/ministry\\\/projects\\\/dump-project-expense-report\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/ministeriocasaverde.com\\\/ministry\\\/projects\\\/dump-project-expense-report\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/ministeriocasaverde.com\\\/ministry\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Projects\",\"item\":\"https:\\\/\\\/ministeriocasaverde.com\\\/ministry\\\/projects\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Dump Project Expense Report\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/ministeriocasaverde.com\\\/ministry\\\/#website\",\"url\":\"https:\\\/\\\/ministeriocasaverde.com\\\/ministry\\\/\",\"name\":\"Ministerio Casa Verde\",\"description\":\"Puerto Barrios, Guatemala\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/ministeriocasaverde.com\\\/ministry\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"es\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Dump Project Expense Report - Ministerio Casa Verde","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/ministeriocasaverde.com\/ministry\/projects\/dump-project-expense-report\/","og_locale":"es_ES","og_type":"article","og_title":"Dump Project Expense Report - Ministerio Casa Verde","og_description":"Expense Report and brief summary \u00a0for Project \u201cEVERY LIFE\u201d August 2014 to May 2015 Q38,443.00 &#8211; Initial construction supply purchase, detail, Purchased locally at\u00a0 Fercompaiz (hardware store). Purchase included, 96 tin roofing sheets of 12 feet each; 1000 cement blocks &hellip; Continue reading &rarr;","og_url":"https:\/\/ministeriocasaverde.com\/ministry\/projects\/dump-project-expense-report\/","og_site_name":"Ministerio Casa Verde","article_modified_time":"2025-10-06T02:06:00+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"4 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/ministeriocasaverde.com\/ministry\/projects\/dump-project-expense-report\/","url":"https:\/\/ministeriocasaverde.com\/ministry\/projects\/dump-project-expense-report\/","name":"Dump Project Expense Report - Ministerio Casa Verde","isPartOf":{"@id":"https:\/\/ministeriocasaverde.com\/ministry\/#website"},"datePublished":"2015-08-15T03:18:40+00:00","dateModified":"2025-10-06T02:06:00+00:00","breadcrumb":{"@id":"https:\/\/ministeriocasaverde.com\/ministry\/projects\/dump-project-expense-report\/#breadcrumb"},"inLanguage":"es","potentialAction":[{"@type":"ReadAction","target":["https:\/\/ministeriocasaverde.com\/ministry\/projects\/dump-project-expense-report\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/ministeriocasaverde.com\/ministry\/projects\/dump-project-expense-report\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/ministeriocasaverde.com\/ministry\/"},{"@type":"ListItem","position":2,"name":"Projects","item":"https:\/\/ministeriocasaverde.com\/ministry\/projects\/"},{"@type":"ListItem","position":3,"name":"Dump Project Expense Report"}]},{"@type":"WebSite","@id":"https:\/\/ministeriocasaverde.com\/ministry\/#website","url":"https:\/\/ministeriocasaverde.com\/ministry\/","name":"Ministerio Casa Verde","description":"Puerto Barrios, Guatemala","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/ministeriocasaverde.com\/ministry\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"es"}]}},"_links":{"self":[{"href":"https:\/\/ministeriocasaverde.com\/ministry\/wp-json\/wp\/v2\/pages\/211","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ministeriocasaverde.com\/ministry\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/ministeriocasaverde.com\/ministry\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/ministeriocasaverde.com\/ministry\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/ministeriocasaverde.com\/ministry\/wp-json\/wp\/v2\/comments?post=211"}],"version-history":[{"count":3,"href":"https:\/\/ministeriocasaverde.com\/ministry\/wp-json\/wp\/v2\/pages\/211\/revisions"}],"predecessor-version":[{"id":846,"href":"https:\/\/ministeriocasaverde.com\/ministry\/wp-json\/wp\/v2\/pages\/211\/revisions\/846"}],"up":[{"embeddable":true,"href":"https:\/\/ministeriocasaverde.com\/ministry\/wp-json\/wp\/v2\/pages\/47"}],"wp:attachment":[{"href":"https:\/\/ministeriocasaverde.com\/ministry\/wp-json\/wp\/v2\/media?parent=211"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}